| Customization: | Available |
|---|---|
| After-sales Service: | Supplied |
| Driven Type: | Electric |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency


| Component | Description |
| Pay-Off Unit | Holds and feeds the copper conductor into the extrusion line |
| Preheater | Heats the conductor to improve insulation adhesion |
| Extruder (φ65+φ40) | Dual-layer tandem extrusion for precise insulation |
| Cooling Water Tank | Rapidly cools extruded cables for dimensional stability |
| Diameter & Eccentricity Tester | Monitors and ensures uniform insulation thickness |
| Spark Tester | Detects insulation defects and ensures electrical integrity |
| Tension Control System | Maintains consistent cable feeding speed |
| Capstan Unit | Provides pulling force to move the cable through the line |
| Take-Up Unit | Collects the finished cable onto reels for easy handling |
